Drains and hedges
Reported in the Blocked drain: Blockage inside drain category anonymously at 16:45, Tue 11 February 2020
Sent to Bath and North East Somerset Council 1 week, 15 hours, 10 minutes later. Council ref: 1992455.
Highfield Lane leading to the Wrangle, due to adverse weather most drains on Highfield Land and the Wrangle are covered with debris. Because it is on a hill debris runs down with the surface rain water. In freezing conditions this lane becomes very dangerous. The hedges are overgrown and are branches are being knocked off onto the highways from high sided vehicles using the lane. We are able to show you where the drains are, as some are completely covered and have not been attended to for a long time. Could you please let me know when the hedges were cut by B&NES please?
Updates
-
Category changed from ‘Blocked drain surface’ to ‘Blocked drain’
Posted by Bath and North East Somerset Council at 07:51, Wed 19 February 2020
-
Thank you for this report. We will review the details and carry out an inspection of the site if required.
4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07
If you have more information about the issue you can add an update to this report.
State changed to: In progress
Posted by Bath and North East Somerset Council at 07:55, Wed 19 February 2020
-
Thank you for this report. We will review the details and carry out an inspection of the site if required.
4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07
If you have more information about the issue you can add an update to this report.
Posted by Bath and North East Somerset Council at 09:53, Wed 19 February 2020
-
We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.
To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08
We'll update this report when the contractor has completed their work.
State changed to: Action scheduled
Posted by Bath and North East Somerset Council at 12:15, Mon 2 March 2020
-
We have now closed this report. If you disagree with this decision, please raise a new report. Please include your previous reference number and an explanation of why you wish the report to be reopened.
State changed to: Closed
Posted by Systems Team at 10:33, Friday 13 January 2023
This report is now closed to updates. You can make a new report in the same location.