Railings have been damaged for many months without a repair having been undertaken.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    State changed to: In progress

    Posted by Bath and North East Somerset Council at 15:20, Wed 5 August 2020

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 24 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads16

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Bath and North East Somerset Council at 10:57, Tue 11 August 2020

  • The repairs to the railings have still not been undertaken despite updates saying that it will be carried out, Please update expected timescales for work

    Posted anonymously at 16:18, Thu 10 September 2020

  • The temporary bollards have fallen down and I have tied one with tape to keep the steps secure. The whole section of railings to the bus stop are loose, the diagonal supports are separated from the vertical supports and the vertical supports have lifted from the lead bonding and need repairing. anyone falling against these will cause them to fail and potentially fall onto the highway.

    Posted anonymously at 15:18, Tue 22 September 2020

  • What is happening please? It seems there‚Äôs been no activity since September 2020; and then it was only exchange of emails.

    Posted anonymously at 12:32, Monday 26 April 2021

  • The situation with the railings has deteriorated since September. The bollards have been removed and the railings are so wobbly they are close to failure. I witness drunken youths trying to break it a month ago. How long before this is repaired? it's a major Health and Safety issue and 6 months after reporting it's still not been repaired.

    Posted anonymously at 15:38, Monday 26 April 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?