Poor condition of Redlands Lane and Bonhill Lane

Reported in the Flooding of a road or pavement category by Barrie Lake at 18:31, Wed 26 August 2020

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 2265259.

In Winter conditions the lanes are in a poor state. None of the road drains work, not because they are necessarily blocked. Due to the poor road surface, rain water bypasses them and therefore accumulates as it moves down the lanes. With the rain water mixing with the farmers hedge cuttings the lanes become a soggy mess. To my knowledge the lanes have not been resurfaced for more than 37 yrs. Underground springs become active and break through the road surfaces. There is a long history of complaints. The most urgent issue is regarding highway safety, the Redlands Lane junction with the A368 is very dangerous. A long history also applies. I gather this may be further investigated by an inspector for which I have requested a site meeting in order to explain the problems in detail. This statement is a small part of long outstanding Issues including petitions etc.that have been raised over a number of years.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Road or Pavement Flooding reports are updated within 7 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads09

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Bath and North East Somerset Council at 18:31, Wed 26 August 2020

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 23 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads10

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 16:23, Wed 21 October 2020

  • We have now closed this report. If you disagree with this decision, please raise a new report. Please include your previous reference number and an explanation of why you wish the report to be reopened.

    State changed to: Closed

    Posted by Systems Team at 10:33, Friday 13 January 2023

This report is now closed to updates. You can make a new report in the same location.