3 blocked drians adding to flooding and skid risk

Reported via desktop in the Blocked drain: Blockage inside drain category anonymously at 10:46, Tue 1 December 2020

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 2412923.

The are 3 blocked drains which I have uncovered, 2 on the left handside of the road going up the hill and one on the right hand side. As a result this is putting pressure on the few drains that are working and causing flooding into my garage when there is heavy rain fall.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 10:46, Tue 1 December 2020

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 15:26, Wed 9 December 2020

  • We've looked into this report and decided not to take any action for now. We've closed this report. However, we check local roads regularly and keep an eye out for issues.

    To find out what we do and how we make these decisions, please visit https://www.bathnes.gov.uk/ fmsroads03

    State changed to: No further action

    Posted by Systems Team at 15:33, Wed 9 December 2020

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 16:37, Wed 9 December 2020

  • Still open, via questionnaire, 14:29, Monday 4 January 2021

  • Our contractor has now completed their work. If this issue reoccurs please log a new report.

    Thank you for using Fix My Street. Reporting issues like this online can help us deal with them more efficiently.

    To find out more about what we do, please visit https://www.bathnes.gov.uk/ fmsroads04

    State changed to: Fixed

    Posted by Systems Team at 13:56, Monday 11 January 2021

This report is now closed to updates. You can make a new report in the same location.