Back to all reports

All gullies / drains on the south side of the Upper Bristol Road along the stretch from the bus stop though to 4 Windsor Villas require clearing of sand, grit and silt.

Reported via mobile in the Blocked drain: Blockage inside drain category anonymously at 12:36, Saturday 23 January 2021

Sent to Bath and North East Somerset Council 1 day, 18 hours, 50 minutes later. Council ref: 2496819.

Following rain the highway drains are unable to clear the surface water and extended /lengthy pools of dirty water collect.

Pedestrians walking along the pavement are therefore drenched with dirty runoff every time a vehicle passes by travelling in the direction towards Bristol.

Dry weather permits the slow discharge of surface water when it can be clearly be seen that the gullies are full of sand, dust, silt and leaves.

I have reported this issue in the past and would greatly appreciate if planned a maintenance programme to clean the gullies can be initiated. Thank you.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Category changed from ‘Blocked drain surface’ to ‘Blocked drain’

    Posted by Bath and North East Somerset Council at 07:25, Monday 25 January 2021

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 07:25, Monday 25 January 2021

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 11:20, Monday 25 January 2021

  • After rain, large puddle obstructing pavement and forcing cyclists into the middle of the road

    Posted anonymously at 12:09, Monday 22 February 2021

  • Our contractor has now completed their work. If this issue reoccurs please log a new report.

    Thank you for using Fix My Street. Reporting issues like this online can help us deal with them more efficiently.

    To find out more about what we do, please visit https://www.bathnes.gov.uk/ fmsroads04

    State changed to: Fixed

    Posted by Systems Team at 06:57, Thursday 11 March 2021

This report is now closed to updates. You can make a new report in the same location.