Entire road needs evaluating

Reported via desktop in the Potholes & road surface category anonymously at 20:11, Mon 10 May 2021

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 2717744.

This road is a very narrow road/track which has seen a dramatic uptick in the amount of traffic using it, in part due to parents dropping off Beavers/Cubs and Scouts who use the land as a camp.

There are a number of problems here: 1: Pot holes and road damage - the road is literally crumbling away in places 2: Lack of passing spaces - there are too few passing spaces for the length of road causing traffic to mount the verges which in turn is causing even more damage. Some passing points are blocked off due to being unsafe to use. 3: Volume of traffic - the road can get quite busy and is wholly unsuitable for regular two-way traffic.

Please can the council re-evaluate this road with a view to making it a one-way system, increase the number of passing spaces and urgently repair the potholes as they are getting large enough to cause vehicular damage

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    9 out of 10 Potholes & Road Surface reports are updated within 10 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 20:11, Mon 10 May 2021

  • We have resolved this issue. If this issue reoccurs please log a new report.

    Thank you for using Fix My Street. Reporting issues like this online can help us deal with them more efficiently.

    To find out more about what we do, please visit https://www.bathnes.gov.uk/ fmsroads05

    State changed to: Fixed

    Posted by Systems Team at 11:09, Tue 11 May 2021

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 30 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads01

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 10:42, Thu 3 June 2021

  • Our contractor has now completed their work. If this issue reoccurs please log a new report.

    Thank you for using Fix My Street. Reporting issues like this online can help us deal with them more efficiently.

    To find out more about what we do, please visit https://www.bathnes.gov.uk/ fmsroads04

    State changed to: Fixed

    Posted by Systems Team at 11:04, Thu 3 June 2021

  • Still open, via questionnaire, 20:34, Mon 7 June 2021

  • We have now closed this report. If you disagree with this decision, please raise a new report. Please include your previous reference number and an explanation of why you wish the report to be reopened.

    State changed to: Closed

    Posted by Systems Team at 10:33, Friday 13 January 2023

This report is now closed to updates. You can make a new report in the same location.