Back to all reports

Block drain on Stanton Lane

Reported via mobile in the Blocked drain: Blockage inside drain category anonymously at 13:41, Monday 24 May 2021

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 2745836.

This issue was previously reported during the winter and the case was marked as completed. To the best of my knowledge no contractor visited the drain. Since then we have had little rain to allow a reassessment of the issue.

As you can see from the photos the rain over the last few days has led to water being pushed up through the drain cover. The water is significant and us running down Stanton Lane.

The drain is directly outside the wall of my grade II listed property and it appears to be causing damage to the wall.

I reside at Guys Farm.

Please could the contractor contact us to confirm what work is being undertaken as I am concerned that unless it is fixed my property is going to suffer significant damage.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 13:41, Monday 24 May 2021

  • I own the field on Stanton Lane, the grass along the sides have been strimmed which is great but my concrete mounting block has been damaged and rolled over which muct take some force as I can't mo e ut one bit to get it back in place. Please can some one put it back where it was as its unusable and in the wrong place now.

    Posted anonymously at 23:47, Saturday 11 September 2021

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 12:05, Tuesday 30 November 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?