Back to all reports

Church Lane, Northend - surface water from leaking drain / springs

Reported via desktop in the Flooding of a road or pavement category by Bath and North East Somerset Council at 10:47, Thu 11 November 2021

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 3117592.

I wish to alert you to a developing problem in Church Lane, Northend. Some months ago, the Council maintenance people laid an area of new tarmac in Church Lane in an attempt to stop spring and drain water from surfacing and causing potential hazard on the road. The effect of this new tarmac has been to shift the point at which the water surfaces, particularly after rainfall, to the middle of the road rather than to one edge. The hydraulic pressure is such that it has lifted the new tarmac off the surface and the flow of water now spreads right across the road and along side the Church side of Church Lane, which it used not to do. I am concerned that this will become a dangerous hazard in cold weather when the water freezes, both for traffic using the lane (which would include myself) and for those trying to access the Church especially via the ramp, which is used by those unable to climb the steps. The water flows out into Northend itself and so would be a potential hazard there, too. I imagine that the solution would be either to create a ditch on one side of the lane or to lay drainage pipes so that the spring and rain water drains into the surface water drainage system.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Road or Pavement Flooding reports are updated within 7 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads09

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 10:48, Thu 11 November 2021

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 23 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads10

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 08:54, Tue 30 November 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?