Damage to pavement outside Moles

Reported via desktop in the Pavement damage category by Bath and North East Somerset Council at 11:34, Wed 8 December 2021

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 3167021.

We have several issues with the pavement outside our building which are damaging for us and potentially dangerous as well. The grouting between the slabs urgently needs redoing. Water is coming into our building through them and they are also a potential trip hazard for pedestrians. Also there is a huge gap between stones at the top of the steps down to the road which is a very dangerous trip hazard. And finally the bin on the pavement outside is not at all secure or sealed. It is literally just balanced on some earth so it looks like a pavement slab has been removed and the bin just put on top. This is causing severe damage through water coming in but also is dangerous as the bin is not secure. It really needs to be concreted or a slab put underneath and all properly sealed.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    9 out of 10 Pavement Damage reports are updated within 10 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads06

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 11:34, Wed 8 December 2021

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 30 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads01

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 08:32, Fri 10 December 2021

  • Our contractor has now completed their work. If this issue reoccurs please log a new report.

    Thank you for using Fix My Street. Reporting issues like this online can help us deal with them more efficiently.

    To find out more about what we do, please visit https://www.bathnes.gov.uk/ fmsroads04

    State changed to: Fixed

    Posted by Systems Team at 12:49, Thursday 13 January 2022

This report is now closed to updates. You can make a new report in the same location.