Location, passing place on uphill of Colliers Lane, on leftside by farm gate; approximately 6 cms deep.

Reported via desktop in the Potholes & road surface category by Adrian Dingle at 15:56, Mon 13 December 2021

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 3177525.

We were driving to a Covid Booster jab at Landsdowne Race Course on Thursday 9th December at just after 2.00 pm. We were forced to pull into a layby (where there was a pothole) to allow a car coming downhill to pass us; there was a loud noise and I subsequently discover the inside of my nearside front tyre was damaged. The wheel was changed for a get-you-home spare. I took the tyre to Melksham tyres that evening and then collected it the next day. They confirmed the damage to the side wall of the tyre had been damaged beyond repair caused by the pothole. I had to pay the bill of £100.00.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    9 out of 10 Potholes & Road Surface reports are updated within 10 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 15:57, Mon 13 December 2021

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 30 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads01

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 11:28, Tue 14 December 2021

  • Our contractor has now completed their work. If this issue reoccurs please log a new report.

    Thank you for using Fix My Street. Reporting issues like this online can help us deal with them more efficiently.

    To find out more about what we do, please visit https://www.bathnes.gov.uk/ fmsroads04

    State changed to: Fixed

    Posted by Systems Team at 11:42, Wed 2 February 2022

This report is now closed to updates. You can make a new report in the same location.