Blocked/Possibly Damaged Drain - Weekesley Lane, Timsbury (BA2 0NH)
Reported via desktop in the Blocked drain: Blockage inside drain category anonymously at 15:14, Thu 17 March 2022
Sent to Bath and North East Somerset Council less than a minute later. Council ref: 3396212.
Blocked/possibly damaged drain by the lower entrance to Meadgate Farmhouse, Weekesley Lane, Timsbury.
Water is running out of the bottom of the garden wall/gateway, suggesting that there is a fracture/blockage in the drainage system. If not repaired, we are concerned that the water will undermine the foundations of the property.
Updates
-
Thank you for this report. We will review the details and carry out an inspection of the site if required.
4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07
If you have more information about the issue you can add an update to this report.
State changed to: In progress
Posted by Systems Team at 15:14, Thu 17 March 2022
-
Whilst undertaking work at Meadgate Farmhouse an independent contractor has advised that the drainpipe is either blocked or damaged. Water does not flow between the upper and lower drains.
Posted anonymously at 16:30, Thu 7 July 2022
-
Whilst investigating a reported pothole in Weekesley Lane Council Staff kindly arranged the urgent replacement of an unsuitable/damaged drain cover on the pathway outside Meadgate Farmhouse. By use of a camera, they also established that the drain was either damaged or blocked by silt and required further investigation. No further action has been taken. The new drain cover is now being lifted by the force of water unable to pass through the damaged and/or silted pipes. The raised cover presents a trip hazard to pedestrians. Since first reported in March 2022 two investigations have established that the drainpipes are either damaged or blocked by silt but no action has been taken.
Posted anonymously at 13:22, Thu 3 November 2022
-
We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.
To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08
We'll update this report when the contractor has completed their work.
State changed to: Action scheduled
Posted by Systems Team at 15:37, Wed 21 December 2022
-
We have now closed this report. If you disagree with this decision, please raise a new report. Please include your previous reference number and an explanation of why you wish the report to be reopened.
State changed to: Closed
Posted by Systems Team at 10:33, Friday 13 January 2023