Improvements to the junction of sleep lane and Hamilton way have resulted damage to the pavement and a very poor repair job. This is directly outside my house and I was led to believe that the works were to cure flooding which never struck me as an issue in the first place. After the works, there is no apparent change to the drainage situation, very poorly patched tarmac as the pictures show. I was also told the mini island was to be increased in height which would be good to slow down the traffic on this rat run. This has not happened. Also the road makings are erased or partly erased in several places. It looks a mess.

Reported via mobile in the Pavement damage category anonymously at 15:47, Wednesday 25 May 2022

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 3551173.

Please se above

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    9 out of 10 Pavement Damage reports are updated within 10 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads06

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 15:48, Wednesday 25 May 2022

  • We've looked into this report and are investigating the issue.
    We will update this report once we decide what action to take.

    State changed to: Investigating

    Posted by Systems Team at 10:53, Thursday 26 May 2022

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 30 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads01

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 10:54, Thursday 26 May 2022

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 30 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads01

    State changed to: Internal referral

    Posted by Bath and North East Somerset Council at 10:55, Thursday 26 May 2022

This report is now closed to updates. You can make a new report in the same location.