Vegetation is growing out of several drains and a couple have virtually disappeared
Reported via desktop in the Blocked drain: Blockage inside drain category anonymously at 09:25, Fri 22 July 2022
Sent to Bath and North East Somerset Council less than a minute later. Council ref: 3697507.
I have repeated reported this issue on the Fixmystreet website and directly to BANES.
Nothing has been done. Vegetation is growing out of several drains and a couple have virtually disappeared. As the rainwater is unable to go down the drains it rushes down the side of road creating deeper potholes in the sides of the road and eroding the trench in the middle of the road (left by the drainage work that was carried out in 2016).
The blocked drains are all the way up the road (on both sides of the road) between R O Dando & Sons and the entrance to Roundhill Farm.
I walk along this road as I do not drive to catch the buses from Chew Magna and because of the blocked drains I am forced into the middle of the road - it is just a matter of time before I am hit by a speeding vehicle as the speed limits that are painted on the roads are just about visible.
Regards
Katie Hudson (Miss)
Updates
-
Thank you for this report. We will review the details and carry out an inspection of the site if required.
4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07
If you have more information about the issue you can add an update to this report.
State changed to: In progress
Posted by Systems Team at 09:25, Fri 22 July 2022
-
We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.
To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08
We'll update this report when the contractor has completed their work.
State changed to: Action scheduled
Posted by Systems Team at 09:59, Mon 8 August 2022
-
Our contractor has now completed their work. If this issue reoccurs please log a new report.
Thank you for using Fix My Street. Reporting issues like this online can help us deal with them more efficiently.
To find out more about what we do, please visit https://www.bathnes.gov.uk/ fmsroads04
State changed to: Fixed
Posted by Systems Team at 08:03, Thu 15 September 2022
This report is now closed to updates from the public. You can make a new report in the same location.