Drain in path, under overhead pipework near pumping station

Reported via mobile in the Blocked drain: Blockage inside drain category anonymously at 09:50, Thu 15 September 2022

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 3826890.

Drain in path, below overhead pipe, between bridge on Bath Hill and wooden bridge over the river.

Drain appears to be full of silt. This path floods every time we get any rain so drain needs to be cleared before the autumn rains start

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 09:50, Thu 15 September 2022

  • This should be dealt with in the next few days.

    Posted by Bath and North East Somerset Council at 10:56, Thu 22 September 2022

  • We've looked into this report and are investigating the issue.
    We will update this report once we decide what action to take.

    State changed to: Investigating

    Posted by Systems Team at 11:39, Mon 26 September 2022

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 11:39, Mon 26 September 2022

  • It has been fixed but I notice that the water level in the drain is very high and with a little rain will easily flood.

    State changed to: Fixed

    Posted anonymously at 11:25, Thu 13 October 2022

  • ‘We’ve recently performed a cleansing exercise in our system to close down all outstanding jobs that were completed some time ago. This closure is for reference only and you do not need to do anything’.

    Posted by Systems Team at 09:30, Wednesday 31 May 2023
    Moderated by Bath and North East Somerset Council at 09:37, Wednesday 31 May 2023

This report is now closed to updates. You can make a new report in the same location.