You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Drain totally blocked with gravel

Reported via desktop in the Blocked drain: Blockage inside drain category anonymously at 15:05, Mon 21 November 2022

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 3981086.

This is a vital drain to stop the road flooding in this area. there are at least 2 blocked drains further up the lane so copious amounts of water are running down the lane. all of these need clearing plus you replaced a stolen drain grid on the corner at the bottom of the lane from the common with a grill that stands proud so takes no water off the road. A couple of months ago you placed a bollard on the blocked drain by our property as, I assume, the grill is rusted out. No action has been taken since then. These blocked drains are an ongoing problem which needs a thorough servicing.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 15:05, Mon 21 November 2022

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 13:52, Wed 23 November 2022

  • ‘We’ve recently performed a cleansing exercise in our system to close down all outstanding jobs that were completed some time ago. This closure is for reference only and you do not need to do anything’.

    State changed to: Fixed

    Posted by Systems Team at 11:34, Mon 26 June 2023
    Moderated by Bath and North East Somerset Council at 11:39, Mon 26 June 2023

This report is now closed to updates from the public. You can make a new report in the same location.