Flooding of A39 and into West Tyning

Reported via desktop in the Flooding of a road or pavement category anonymously at 08:40, Thu 12 January 2023

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 4117326.

The water is flooding down West Tyning. The water is approx 18inches wide and 2-3 inches deep. This is a combination of a blocked drain and a local field not having any drainage. The drainage in the area is not sufficient whenever there's any degree of rain, with historic problems of flooding people's gardens in West Tyning. Residents have had to lift their drain covers to drain water down.

Part of this is a result of a company doing roadworks a couple of years ago, as this is when problems seem to have surfaced most and mucked up drainage. Additionally, vehicles are hitting water on the A39 which impacts and water further surges West Tyning as a result.

The road is currently passable in a vehicle, but you can't leave the road by foot due to the extent of the water. Please could you look into the drainage in this area?

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Road or Pavement Flooding reports are updated within 7 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads09

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 08:40, Thu 12 January 2023

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 23 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads10

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 17:06, Mon 30 January 2023

  • We are pleased to say that our contractor has now completed their work. If this issue reoccurs, please log a new report. You can visit our website to find out more about what we do. Thank you for using Fix My Street, your online reporting helps us deal with problems more efficiently, while keeping you informed.https://beta.bathnes.gov.uk/ how-we-deal-problems-road-network

    State changed to: Fixed

    Posted by Systems Team at 12:28, Fri 7 July 2023

This report is now closed to updates from the public. You can make a new report in the same location.