You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new
report here
Reposition
report here
Back to all reports

Blocked drain causing water to exit from higher drains causing road flooding

Reported via desktop in the Blocked drain: Blockage inside drain category anonymously at 12:11, Tuesday 17 January 2023

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 4140254.

Water backing up from higher drains causing flooding across road. With current below freezing temperatures this is forming as black ice. A road traffic hazard.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 12:11, Tuesday 17 January 2023

  • Ice has built up and is now very slippery, the patch is at the junction of Sunnyvale. East bound traffic may slide toward the footpath from the bridge over Cam Brook from Cam Brook Close is there any grit available to try to help with the ice? this patch is always getting icy in sub zero temperatures, and doesn't always clear if the sun is low due to the hedge causing a shadow.

    Posted anonymously at 11:30, Thursday 19 January 2023

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 11:26, Monday 30 January 2023

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a FixMyStreet password?