Reported via mobile in the Flooding of a road or pavement category anonymously at 10:38, Wednesday 22 March 2023

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 4344629.

Every time it rains the drain blocks and the end of the cul de sac is flooded. Overflow water then runs down the drives of the surrounding properties. The turning point can then not be used.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Road or Pavement Flooding reports are updated within 7 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads09

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 10:38, Wednesday 22 March 2023

  • Drain is completely blocked and is not draining water . They have been out now with a little road sweeping truck and have cleaned the top however the drain is completely blocked. It is the only drain in this end of the road and the water is up to a foot deep . Needs to be investigated urgently as it is causing flooding.

    Posted anonymously at 16:14, Thursday 23 March 2023

  • Drain is completely blocked and is not draining water . They have been out now with a little road sweeping truck and have cleaned the top however the drain is completely blocked. It is the only drain in this end of the road and the water is up to a foot deep . Needs to be investigated urgently as it is causing flooding.

    Posted anonymously at 17:30, Thursday 23 March 2023

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 23 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads10

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 08:21, Tuesday 28 March 2023

  • When is this issue being resolved. This was reported on 23.03.23!!

    Posted anonymously at 10:27, Wednesday 31 May 2023

Provide an update