You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Drain midway between 7 and 8 Rosemount Lane

Reported via desktop in the Blocked drain: Blockage inside drain category anonymously at 18:35, Thu 23 March 2023

Sent to Bath and North East Somerset Council less than a minute later. Council ref: 4351491.

Drain midway between 7 and 8 Rosemount Lane contains a large amount of grit etc. Drains lower down Rosemount have been cleared periodically, but neither this, nor the next up the hill have been. The drain is now essentially a soakaway, which sometimes can't cope with the rate of flow of water into it. During the last two years the damp inside the outside and inside walls of 7 Rosemount has increased, which I believe may be due to the constant presence of water in the drain. Moreover it occasionally smells of H2S, suggesting some sewage leak/discharge into it - Wessex water are aware.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for this report. We will review the details and carry out an inspection of the site if required.

    4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07

    If you have more information about the issue you can add an update to this report.

    State changed to: In progress

    Posted by Systems Team at 18:35, Thu 23 March 2023

  • We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.

    To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08

    We'll update this report when the contractor has completed their work.

    State changed to: Action scheduled

    Posted by Systems Team at 09:35, Tue 28 March 2023

  • We are pleased to say that our contractor has now completed their work. If this issue reoccurs, please log a new report. You can visit our website to find out more about what we do. Thank you for using Fix My Street, your online reporting helps us deal with problems more efficiently, while keeping you informed.https://beta.bathnes.gov.uk/ how-we-deal-problems-road-network

    State changed to: Fixed

    Posted by Systems Team at 14:23, Thu 13 July 2023

This report is now closed to updates from the public. You can make a new report in the same location.