report here Reposition
report here
In progress
Drain midway between 7 and 8 Rosemount Lane
Reported via desktop in the Blocked drain: Blockage inside drain category anonymously at 18:35, Thursday 23 March 2023
Sent to Bath and North East Somerset Council less than a minute later. Council ref: 4351491.
Drain midway between 7 and 8 Rosemount Lane contains a large amount of grit etc. Drains lower down Rosemount have been cleared periodically, but neither this, nor the next up the hill have been. The drain is now essentially a soakaway, which sometimes can't cope with the rate of flow of water into it. During the last two years the damp inside the outside and inside walls of 7 Rosemount has increased, which I believe may be due to the constant presence of water in the drain. Moreover it occasionally smells of H2S, suggesting some sewage leak/discharge into it - Wessex water are aware.
Updates
-
Thank you for this report. We will review the details and carry out an inspection of the site if required.
4 out of 5 Blocked Drain reports are updated within 5 working days once we decide what action to take. To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads07
If you have more information about the issue you can add an update to this report.
State changed to: In progress
Posted by Systems Team at 18:35, Thursday 23 March 2023
-
We've looked into this report and passed the details on to our contractor. They will plan and carry out any work needed. 4 out of 5 issues are updated within 26 working days.
To find out what we do and why it might take longer, please visit https://www.bathnes.gov.uk/ fmsroads08
We'll update this report when the contractor has completed their work.
State changed to: Action scheduled
Posted by Systems Team at 09:35, Tuesday 28 March 2023
Provide an update
Your information will only be used in accordance with our privacy policy