Action scheduled
Blocked Drains & Regular Flooding
Reported via desktop in the Blocked drain: Blockage inside drain category anonymously at 09:24, Saturday 2 March 2024
Sent to Bath and North East Somerset Council less than a minute later. Council ref: 5656486.
Blocked drains and longstanding, regular flooding as a result on the High Street, Bathford including on a dangerous bend that frequently has serious accidents. This is causing serious continued issues with flooding of the road during heavy rain. At times the road has almost been impassable as the water coming down from the long hill and slope towards Bathford merge. Recent gas works digging up the pavement may also have exacerbated the silt. There are insufficient drains on the High Street and it needs to be surface cleaned as well to remove silt. The amount of water going down one of the drains when working has also caused trees to fall down into the road as the high volume of water is washing away soil and weakening roots as a result. This area has been the source of several near fatal accidents as people take the bend too fast and lose control, so please could you take action before we have a fatal accident. Thank you.
Updates
-
Thank you for your report. We will review the details you submitted and will inspect the site if necessary.
You can support our investigation by providing as much detail as possible. If you can provide any extra information, please add an update to this report.
We respond to 4 out of 5 reports of blocked drains within 5 working days, once we have decided on the best course of action.
You can visit our website to find out what we do and why it can take longer than you might expect. https://beta.bathnes.gov.uk/ how-we-deal-problems-road-network
State changed to: In progress
Posted by Systems Team at 09:25, Saturday 2 March 2024
-
Further photos showing the extent of flooding today. I will attach further photos of the issues elsewhere on the High Street in Bathford. Please could someone call me to discuss the issue as it is also causing considerable damage to our land.
Posted anonymously at 13:52, Saturday 2 March 2024
-
Thank you for your report. We have investigated your issue and have passed the details onto our contractor.
They will plan and complete any necessary work. We will update your report when the contractor has completed the work.
We respond to 4 out of 5 reports within 26 working days, once we have decided on the best course of action. You can visit our website to find out what we do and why it can take longer than you might expect. https://beta.bathnes.gov.uk/ how-we-deal-problems-road-networkState changed to: Action scheduled
Posted by Systems Team at 12:39, Monday 4 March 2024
-
Please could we have an update on this as it's been nearly a month now and still bad.
Posted anonymously at 21:40, Friday 29 March 2024
Provide an update