Fixed
Potholes, mounds of grit, collapsed banks
Reported via mobile in the Potholes & road surface category anonymously at 11:28, Thu 28 March 2024
Sent to Bath and North East Somerset Council less than a minute later. Council ref: 5777557.
This section of lane is an ongoing problem which we have reported numerous times with limited success. The constant flooding because of several blocked drains has resulted in a lane in total disrepair - huge potholes and large heaps of solid grit washed down the hill, very dangerous for cyclists, motorbikes and car tyres. The banks around the drains are never cleared back nowadays so that even if the drains are working much of the rain water pours down the hill straight past the drains. The banks on either side of the lane are now collapsing sending mud and huge stones onto the highway, another hazard for motorists, cyclists and walkers.The lane down the hill from Hinton Blewett to the corner at the bottom outside our cottage is in total disrepair and needs reconstructive action.
Updates
-
Thank you for your report. We will review the details you submitted and will inspect the site if necessary.
We respond to 9 out of 10 reports of potholes and road surface issues within 10 working days, once we have decided on the best course of action. You can visit our website to find out what we do and why in some cases it can take longer than you might expect. https://beta.bathnes.gov.uk/ how-we-deal-problems-road-networkYou can support our investigation by providing as much detail as possible. If you can provide any extra information, please add an update to this report.
State changed to: In progress
Posted by Systems Team at 11:28, Thu 28 March 2024
-
Thank you for your report. We have investigated your issue and have passed the details onto our contractor. They will plan and complete any necessary work. We will update your report when the contractor has completed the work. We respond to 4 out of 5 reports within 30 working days, once we have decided on the best course of action.
You can visit our website to find out what we do and why it can take longer than you might expect. https://beta.bathnes.gov.uk/ how-we-deal-problems-road-network
State changed to: Action scheduled
Posted by Systems Team at 14:49, Thu 28 March 2024
-
We are pleased to say that our contractor has now completed their work. If this issue reoccurs, please log a new report. You can visit our website to find out more about what we do. Thank you for using Fix My Street, your online reporting helps us deal with problems more efficiently, while keeping you informed.https://beta.bathnes.gov.uk/ how-we-deal-problems-road-network
State changed to: Fixed
Posted by Systems Team at 15:45, Fri 2 August 2024
This report is now closed to updates from the public. You can make a new report in the same location.