Closed
Rainwater still not properly managed to prevent flooding
Reported via desktop in the Blocked drain: Blockage inside drain category anonymously at 17:07, Thursday 4 June 2026
Sent to Bath and North East Somerset Council 6 days, 16 hours, 3 minutes later. Council ref: 9562763.
Thanks for clearing surface of gullies (incident 9547136) which I had already done before you came. The problem is much bigger as: 1. The road needs to be swept of all the mud, leaves, litter, blossom and pothole gravel that in 5 minutes of heavy rain swish into the gullies and blocks them - and this needs to be done regularly and especially before bad weather. 2. North Road's gullies are mostly all blocked above and below Cleveland Walk, allowing a torrent of water to flow into Cleveland Walk, overwhelming our gullies. They all need to be unblocked, the road swept and the potholes fixed as it's a mixture of water and gravel that now flows into our street. 3. The road gradients and cambers on North Road and Cleveland Walk and the junction between the two need to be reconsidered as they are part of the problem, reducing the ability of the gullies to do their job. Everything seemed fine before the road re-surfacing of about 20 years ago that increased the height of the roads.
Updates
-
We've passed this report to another team in the council. They will carry out any further work needed. Sometimes it can take a little longer as a result.
We'll update this report once we've decide what action to take.
Category changed from ‘Blocked drain: Blockage on surface’ to ‘Blocked drain: Blockage inside drain’
Posted by Bath and North East Somerset Council at 09:10, Thursday 11 June 2026
-
Thank you for your report. We will review the details you submitted and will inspect the site if necessary.
You can support our investigation by providing as much detail as possible. If you can provide any extra information, please add an update to this report.
We respond to 4 out of 5 reports of blocked drains within 5 working days, once we have decided on the best course of action.
You can visit our website to find out what we do and why it can take longer than you might expect. https://beta.bathnes.gov.uk/ how-we-deal-problems-road-network
State changed to: In progress
Posted by Systems Team at 09:10, Thursday 11 June 2026
-
We've passed this report to another team in the council. They will carry out any further work needed. Sometimes it can take a little longer as a result.
We'll update this report once we've decide what action to take.
Posted by Bath and North East Somerset Council at 09:17, Thursday 11 June 2026
-
We have looked at this issue and included it in an existing programme of work.
The report is now closed, further comments may not be monitored.State changed to: Internal referral
Posted by Systems Team at 08:58, Friday 12 June 2026
This report is now closed to updates from the public. You can make a new report in the same location.